The Site: February 1999 (2/2)


 
 
Stefan installing the beam director.   A look upwards to the hovering top plate with suspension and local control units.
 
 
Stefan installing the double pendulums.   Valerie installing the camera for the mirror monitoring system.
 


Navigator:
previous page        GEO 600 homepage        next page
Problems or questions? Contact the webmaster!