The Site: February 1999 (2/2)
Stefan installing the beam director.
A look upwards to the hovering top plate with suspension and local control units.
Stefan installing the double pendulums.
Valerie installing the camera for the mirror monitoring system.
Navigator:
Problems or questions? Contact the
webmaster
!