The Site: Summer 2001


June 15th

Suspension

In the north tank of GEO 600 a monolithic fused silica suspension has been installed. This is the first fully monolithic suspension of a testmass worldwide. The monolithic suspension for the east tank is ready to be installed.

Data

At the same time the principal investigators of GEO and LIGO signed a Memorandum of Understanding concerning the sharing and joint analysis of data.
June 19th

The monolithic suspension in the east tank has been successfully installed. Thus the first large interferometer with monolithic suspension is ready to start operation.

August 7th

All the mirrors have been aligned (except for the signal recycling mirror which is not yet installed) and Michelson fringes have been observed with a period of about one second.