The Site: Summer 1997 (1/3)


Tasks to be done: Liners have to be inserted into the tubes at all four ends in order to reduce the stray light. The gate valves have to be mounted. The first tanks have to be moved to the central station.

Inside the central building

 
 
One of the gallows with a gate valve
in front of the tube.
  The gallery.
 
 
Details of the ventilation system
to be installed.


Navigator:
previous page        GEO 600 homepage        next page
Problems or questions? Contact the webmaster!