Tasks to be done: Liners have to be inserted into the tubes at all four ends in order to reduce the stray light. The gate valves have to be mounted. The first tanks have to be moved to the central station.
|
| |
| One of the gallows with a gate valve in front of the tube. | The gallery. | |
| ||
| Details of the ventilation system to be installed. |