The Site: June 1999 (2/2)
Meanwhile at the site
Kerstin and Stefan are controlling the laser system (left hand side).
The central cluster of vacuum tanks.
Kasem and Walter are installing a new turbopump.
Navigator:
Problems or questions? Contact the
webmaster
!