The Site: June 1999 (2/2)


Meanwhile at the site

 
Kerstin and Stefan are controlling the laser system (left hand side).
 
 
The central cluster of vacuum tanks.   Kasem and Walter are installing a new turbopump.
 


Navigator:
previous page        GEO 600 homepage        next page
Problems or questions? Contact the webmaster!